Residential Work

Project (3)

2021-02-10T18:36:40+03:00

Cooperate with the Al-Jonoob Bureau Engineering/Basarh to the Construction two buildings (turn-key) in Basrah Overall project value: 1 100 000 000 I.D Proportion Carried out [...]

Project (2)

2021-02-09T22:24:22+03:00

Cooperate with the Al-Jonoob engineering/Basrah to the Construction five houses (turn-key) in Basrah Overall project value: 690 000 000 I.D Proportion Carried out by Candida [...]

Go to Top