Cooperate with the Al-Jonoob Bureau Engineering/Basarh to the Construction two buildings (turn-key) in Basrah Overall project value: 1 100 000 000 I.D Proportion Carried out [...]
Project (2)
admin2021-02-09T22:24:22+03:00Cooperate with the Al-Jonoob engineering/Basrah to the Construction five houses (turn-key) in Basrah Overall project value: 690 000 000 I.D Proportion Carried out by Candida [...]
Project (1)
admin2021-03-29T21:22:07+03:00Cooperate with Al-Nada Company for the general Contracts/Baghdad as a subcontractor Maintenance of the electricity in the Basrah Hospital. Installation and Operating the inver [...]


