Direct Contract no. 5/2/33/87S dated 28/1/2009 with the General Directorate for Electric Energy Transmission
Direct Contract no. 5/2/33/87S dated 28/1/2009 with the General Directorate for Electric Energy Transmission/South for Supplying Joints and Ends (Terminations) of 132Kv cables,800Seq.mm, XLPE from PFISTERER AG, Switzerland Origin and Training The staff of the general directorate for the erection and maintenance of the jointing & terminating, the period of projects six months.
Single source responsibility for
Oil
Gas
Power
Petrochemical
Construction industries




